Load a Previously Saved Draft

Explanation

This activity is used to resume a previous assistant session that was saved without finishing the employee creation.

Prerequisites

In order to perform this activity:

System Effects

As a result of this activity, if the assistant will be finished and a new employment will be created, the draft will be deleted.

Window

New Employee

Related Window Descriptions

New Employee

Procedure

  1. Open the New Employee assistant.
  2. In the Select Configuration area, enter the assistant configuration. It will determine what steps and fields are available in the assistant.
    Note: A configuration can be automatically suggested to you if it was set up that way.
  3. In the Select Template area, you can select an assistant template (if available). The template will fill in some of the assistant's fields.
  4. In the Select Option area, select the Open Draft option.
  5. In the field located below the option, enter the identifier of a draft which you want to load.
  6. Click Next.
  7. Proceed to the next activity to fill in the assistant steps