Update Linear Asset Pre-Postings

[About Linear Asset] [About Posting Control - Supply Chain and Manufacturing] [To Linear Asset Administration]

Usage

Use this dialog box to update one or several marked sections with either all pre-posting code parts from the linear asset, or just the code parts that already does not have a value.

For example

  Code C Code F Code G
Linear Asset X Y  
Section 1 A B C

We have a linear asset with code part values as shown in the table above. Right click option Update with LA Pre-Postings and choosing the option Update ONLY Pre-Posting code parts that has value on LA will generate following values:

  Code C Code F Code G
Linear Asset X Y  
Section 1 X Y C

Choosing the other option, Update ALL Pre-Posting code parts will generate following values:

  Code C Code F Code G
Linear Asset X Y  
Section 1 X Y  

Activity Diagrams

N/A

Activities

N/A