Use this activity to change the scheduling direction of the shop order. You can use either forward scheduling or backward scheduling.
The shop order must have been created.
As a result of this activity the system reschedules the operations for the selected shop order.
A message asking you to review the peggings will be displayed if the shop order is pegged.