Purpose: The purpose of these initial exercises is that the instructor will use them for demonstrating the basic functionality in designing a project delivery product, which entails:
Registering a Delivery Project
Creating Project Product Structure
Monitoring All Parts in the Project Product Structure
Connecting Requirement Activities
Approving Project Part Definition and Project Items
IMPORTANT |
These Initial Exercises are intended for
instructor use. If you are a student, it is extremely important that you set up and work within your own site to maintain your data integrity. If you work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable exercise results require that your data be isolated in your own site. |
Purpose: The purpose of this exercise is to introduce you
to the basic functionality of registering a new delivery project.
Prerequisites: The delivery project must exist as a project in IFS/Project
and connected to the project site.
Windows:
Projects
Delivery Projects
Steps: To complete this exercise, perform the following steps in the sequence shown.
Purpose: The purpose of this exercise is to introduce
you to the basic functionality of creating a project product structure.
Prerequisites: Project items composing the project product structure must
exist engineering parts in IFS/PDM-Configuration.
Windows:
Project Item
Project Item/Consist Of
Project Product
Project Product/Items
Steps: To complete this exercise, perform the following steps in the sequence shown.
Purpose: The purpose of this exercise is to introduce
you to the basic functionality of monitoring all parts in the project product
structure.
Windows:
Project Product
Project Product/PartDefinition
Project Product/Items
Steps: To complete this exercise, perform the following steps in the sequence shown.
Purpose: The purpose of this exercise is to introduce
you to the basic functionality of connecting requirement activities to the
project product structure.
Prerequisites: Project activities to be connected to the project specific
project items must be registered for the project, while standard planned project
items must have been specified with the corresponding Std Planned Item
checkbox.
Windows:
Project Navigator
Project Navigator/Activity
Project Product
Project Product/Items
Steps: To complete this exercise, perform the following steps in the sequence shown.
Purpose: The purpose of this exercise is to introduce
you to the basic functionality of approving the project product structure by
approving the project part definition and project items.
Prerequisites: The project must be approved first in IFS/Project.
Windows:
Projects
Project Product
Project Product/Items
Project Product/Part Definitions
Steps: To complete this exercise, perform the following steps in the sequence shown.
Note: These initial exercises are connected to the initial exercises found in the second main process in Project Delivery, called Project Part Procurement Preparation.
Copying forbidden: The material in this manual is protected by copyright law, and may not be copied entirely or in part, without the prior permission of Industrial & Financial Systems AB. © 2012 Industrial & Financial Systems AB