IMPORTANT |
It is extremely important that you set up and work within your own site to maintain your data integrity. If you work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable exercise results require that your data be isolated in your own site. |
Purpose: The purpose of this exercise is to create the required data that will be used in the Discrete Manufacturing exercises. This sets up data for your site and needs to be done only once for the Discrete Manufacturing courses exercises.
General exercise for Overview of Discrete Manufacturing Data
Purpose: The purpose of this exercise is to set up an inventory picking location for running functionality isolated by site.
Windows:
Inventory Locations
Site | Location No | Warehouse | Location Name | Location Group |
Your Site | 2C | Sub | Subassembly inv | 30 |
General exercise for Entering Inventory Locations
Purpose: The purpose of this exercise is to set up a product structure alternative on your site for the discrete racing engine cooling system.
Windows:
Product Structure
Product Structure/Product Structure
Note: The destination alternative number will automatically change from the source alternative number to the next higher integer. Therefore, you must change the site to your site and change the alternative number to match the source alternative number.
Site | Part No | Part Description | Alternative | Alternative Description |
Your Site | 21-240 | Cooling System | 1 | Off-Road |
General exercise for Copying Revisions
Purpose: The purpose of this exercise is to set up alternate components for discrete racing engines for running functionality isolated by site.
Windows:
Alternate Component
Substitution Sequence | Alternate Part | Alternate Part Description | Qty Per Component |
1 | 21-345 | Cooling Line Assy, Off-road 1 | 1 |
1 | 21-346 | Cooling Line Assy, Off-road 2 | 1 |
General exercise for Defining Alternate Component
Purpose: The purpose of this exercise is to set up a manually created shop order with the default information that will be modified in the main exercises below.
Note: Record the shop order number so that it will be easy to identify the correct shop order for the exercise.
Site | Part No | Part Description | Lot Size | Earliest Start Date | Shop Order Number |
Your Site | 21-240 | Cooling System | 10 | One week after today |
General exercise for Creating Shop Orders Manually
Purpose: The purpose of this exercise is to ensure that the right quantities are available for manufacturing before you start the main exercises below.
Windows:
Inventory Part Currently On Hand
Receive Inventory Part
Issue Inventory Part
Site | Part Number | Part Description | Quantity Available for Manufacturing |
Your Site | 21-345 | Cooling Line Assy, Off-road 1 | at least 5 but no more than 9 |
Your Site | 21-346 | Cooling Line Assy, Off-road 2 | at least 10 |
General exercise for Receiving Inventory Part
General exercise for Issuing Inventory Part
Purpose: The purpose of this exercise is to modify the component material on a shop order by changing the structure revision and alternate or by changing the component material requirements manually.
Windows:
Shop Order
Shop Order/Detail
Shop Order/Material
Alternate Component
You are the person responsible for maintaining the shop order information. Today you need to make changes to the component material on a shop order for building a cooling system. The changes are:
Change the structure alternate to the one for an off-road cooling system.
Note: It is also possible to define the values for the Structure Revision and Structure Revision Alternative fields on the Detail tab by entering the values directly into the fields when the shop order is created.
Add sheet steel as a component to fulfill a specific request.
Change the quantity of thermostats required.
Note: If you update the Qty Required field on an allocation line, the Qty Per Assembly field will not be updated to reflect the relation between the lot size and the quantity required.
Remove the sheet steel due to modified request.
Note: If component material has already been issued for the component part you want to remove, you will need to unissue the component parts first. It is also possible to reduce the quantity required for a component part. However, if you want to reduce the quantity required to less than the quantity already issued, it will be necessary to unissue material first.
Replace the cooling line assembly with its alternate component.
Copying forbidden: The material in this manual is protected by copyright law, and may not be copied entirely or in part, without the prior permission of Industrial & Financial Systems AB. © 2012 Industrial & Financial Systems AB