Period Template—Exercise
IMPORTANT |
It is extremely important that you set up and work within your own site to maintain your data integrity. If you
work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable
exercise results require that your data be isolated in your own site. |
Main Exercise
Purpose: The purpose of this exercise is to show you how to set up a
period template.
Windows:
Period Template Maintenance
- Open the
Period Template Maintenance
window.
- Select New.
- Select a site in the Site field. Enter a valid
site code or use the List of Values to select the site.
- Enter the number of the period template in the
Template ID field.
- Enter the description of the template in the
Template Description field.
- Select a calendar in the Calendar field. Use the
List of Values to select from available calendars.
- Select the begin date for period 1 in the Period 1
Begin Date field.
- With the cursor in the table area, select New. The
period number will be automatically assigned.
- Enter the length of the period in the Period
Length field.
- Select the unit of the period length in the Plan
Period Unit list box.
- Save the record. The fields Length in Work Days,
Period Begin Date, and Period End Date are updated automatically by the
system.
Copying forbidden: The material in this manual is protected by copyright law, and may not be copied entirely or in part, without the prior permission of Industrial & Financial Systems AB. © 2012 Industrial & Financial Systems AB